Latest articles

Distributed Power Europe, what we saw in Rimini

The first edition of Distributed Power Europe took place in Rimini from 5 to 8 November, as part of Ecomondo-Key Energy. Fpt Industrial’s Cursor 9 had a connection with Energy Rental, Sices and Riello Ups with a view to reducing emissions.   We will talk about it later on. In the meantime...
News

Distributed Power Europe. Generation with no limits

No limits both in geographic terms and in applications. Yes, because at the Rimini Exhibition Center, from 5 to 8 November, the first edition of the Distributed Power Europe will take place, organized by the Italian Exhibition Group. Distributed Power Europe (DPE), a new point of reference for the o...

Highlights

Dellorto two-track strategy

The two-track strategy allows the Dellorto group to extend and customise its expertise in EGR, throttle bodies, power units, BMS and batteries from motorbikes to off-highway applications with long-life requirements

Distributed Power Europe

Distributed Power Europe, what we saw in Rimini

The first edition of Distributed Power Europe took place in Rimini from 5 to 8 November, as part of Ecomondo-Key Energy. Fpt Industrial’s Cursor 9 had a connection with Energy Rental, Sices and Riello Ups with a view to reducing emissions.   We will talk about it later on. In the meantime...
News

Distributed Power Europe. Generation with no limits

No limits both in geographic terms and in applications. Yes, because at the Rimini Exhibition Center, from 5 to 8 November, the first edition of the Distributed Power Europe will take place, organized by the Italian Exhibition Group. Distributed Power Europe (DPE), a new point of reference for the o...