Latest articles

100 MW of overall power for a MAN ES project in Bolivia

A MAN ES project in Bolivia provides more than 100 MW of overall electric power to the iron ore mine in El Mutún, on the border with Brazil. More into details, MAN Energy Solutions delivered ten MAN 20V35/44G gas engines with a combined capacity of over 100 megawatts. The El Mutún mine is one of [&h...

Highlights

Dellorto two-track strategy

The two-track strategy allows the Dellorto group to extend and customise its expertise in EGR, throttle bodies, power units, BMS and batteries from motorbikes to off-highway applications with long-life requirements

martin hoehler

100 MW of overall power for a MAN ES project in Bolivia

A MAN ES project in Bolivia provides more than 100 MW of overall electric power to the iron ore mine in El Mutún, on the border with Brazil. More into details, MAN Energy Solutions delivered ten MAN 20V35/44G gas engines with a combined capacity of over 100 megawatts. The El Mutún mine is one of [&h...