Accelera to power electrolyzer system for bp’s Lingen green hydrogen project
The hydrogen-generation system set to power bp’s Lingen project will consist of 20 PEM HyLYZER — 1000 electrolyzer units — the largest electrolyzer system assembled by Accelera to date — and is being manufactured in Accelera’s new electrolyzer plant in Guadalajara, Spain.